Structural – Car Park & School Playground Ground Works, Wigan


C Scotland Construction was awarded the contract following competitive tendering to improve the external ground space at a Wigan Primary School. The works were undertaken during the summer holidays.

The initial preparation works involved the widening of existing footways and excavation for the construction of a new car park. The existing surface to the playground area was removed to enable resurfacing works.

Excavation works generally required the removal offsite of approximately 150m³ of material. The construction of the new 125m² car park was achieved with the installation of 70m of kerbs and 100mm thick bituminous surfacing on recycled MOT type 1 sub-base 250mm thick.

Footways and playground areas were edged with a combination of pcc and timber edgings with minimum 100mm thick sub-base as required prior to surfacing.  Finally all surrounding areas were re landscaped and turfed.

 

school_wigan1

school_wigan2

school_wigan3

school_wigan4

school_wigan5

school_wigan6

school_wigan7

school_wigan8

school_wigan9

school_wigan10