Residential – External Improvements, Adlington


A timber framed building, 75% of which is finished in rendered cladding.  The existing fabric displayed significant signs of deterioration.  CSC Limited where engaged to undertake remedial works which involved the erection of scaffold and the removal of defective render and replacement of the underlying rotten cladding boards and timber frame where necessary.  Thereafter an installation of a 50mm EPS Alumasc render system over the existing areas of render was  applied. The benefits of this are not only to restore the integrity of the surface finish and protect the substrate but also to enhance the insulated properties of the building fabric.

Some internal works in relation to strengthening of timber floors and staircase balustrades etc have also been undertaken.

 

residential-adlington4residential-adlington3

residential-adlington2

residential-adlington1