Commercial & Industrial – Car Park Refurbishment, Heywood


C S Construction was engaged to increase the area of the existing car park to a local rugby club to accommodate additional visitors.

This was achieved by excavation generally to a depth of 300mm and disposal offsite of all material arising.

Following the installation of pcc edgings to the perimeter, a layer of Mot type 1 sub-base 150mm thick was laid upon a geotextile.

Thereafter a grit sand layer 50mm thick was screed to level, upon which matrix paving was laid and in filled with a 10-5mm gravel layer to create a free drainage car park.

 